Manual
4.7 Storage
The Multiphase Test Connector must always have its cover snapped on and be in its protective sheath when it is
transported or stored (see subchapter Preparations, p. 17).
5. Operating instructions
5.1 Components and displays
2
6
4
5
1
Enclosure
2
Locking lever
3
Seal
4
Insert
5
Contacts
6
Earth protection
5.2 Status displays
Description
Star circuit
Colour: white
1
12
10
3
7
8
9
10
11
12
8
7
Displays – star or delta circuit (white)
Display – phase L1 (orange)
Display – phase L2 (orange)
Display – phase L3 (orange)
Display – clockwise rotating field (green)
Display – counter-clockwise rotating field (red)
11
9
19