Herunterladen Inhalt Inhalt Diese Seite drucken

Electrical Connections; Operation; Starting Up; Loading Cabinet - Norpe AIDA Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 53
PI
2. Dry the surfaces carefully.

3. Electrical connections

NOTE
The symbol marked on the cabinet (a lightning bolt inside a triangle) indicates that
there are components and wires under the cover containing live voltage. Only
personnel qualified to install and service electrical equipment are permitted access
to areas that contain live voltage.
Check the voltage and size of the fuse required on the rating plate attached to the cabinet. The
supply socket must be earthed and protected by a 10 A slow fuse. No other appliances may be
connected to the same fuse.
NOTE
All electrical connections must be carried out by approved and qualified personnel
and comply with all IEE and local regulations, failure to do this could result in
personal or fatal injury.

4. Operation

The cooling is achieved by a fan evaporator system. The evaporator is located at the bottom of
the cabinet's tray. The fans circulate the cooled air through the grid behind the bottom shelf up
to the top of the cabinet. The cooled air is evenly distributed over all shelves in the cabinet towards
the front glass cover. Replacement air is sucked through the front grid at the bottom of the cabinet.
The cabinet is equipped with a NRC-100 controller, which turns off the cabinet's lights or turns
on the red signal light on the controller's panel in case of a pressure rise caused, for example,
by dirt in the condenser. For the location of the controller's signal light on Saga, see figure 5 on
the inside cover; for the location of the light on Aida, see figure 9.
See figure 5 on the inside cover for the location of the cabinet's light switch (Saga), and figure 9
(Aida).

4.1. Starting up

1. Connect the plug to the supply socket.
The compressor and fans start operating.
2. Wait for 90 minutes or until the desired temperature is reached. The thermostat has been
set to the correct temperature at the factory.
The cabinet is now ready to be filled.
NOTE

4.2. Loading cabinet

• Do not place goods on top of the cabinet.
Version 1/2011
Saga/Aida H -version (heated display cabinet): add fresh water to water
container, see figure 2, item D on the inside cover. Always keep water in the
container!
ENGLISH
6

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Saga

Inhaltsverzeichnis