Herunterladen Inhalt Inhalt Diese Seite drucken

Attachment And Operation - Powerfix Profi CHAIN HOIST 1000 KG Bedienungs- Und Sicherheitshinweise Originalbetriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 80
Adjustment of the hand chain
Before you lift a load with the chain hoist, you should make yourself familiar
1
with the "without load" function of the chain hoist.
Brake control system
2
Test the brakes as follows:
• Hung the load
• Lift the load
• Lift and lower the load to various heights
• Check whether load holding in any position is ensured

8. Attachment and operation

Make sure the chain hoist is securely fastened. Be careful when choosing
1
fastening points. These points must be able to carry double the load. If you
are unsure as to whether the chosen point is the right one, please choose a
different one.
2
The chain hoist should be fastened so that it cannot change its position dur-
ing operation.
The latch locks which are attached to the fastening hook and the load hook
3
must always be closed during operation.
4
The maximum height of the anchor point must not be higher than 3.5 m.
The chain hoist is supplied with a hand chain whose
length is proportional to the pass of the pulley. In case
of normal installation it satisfies the condition of prop-
er adjustment of the chain end. In cases in which the
length of hand chain does not appeal the prescribed
conditions, it is necessary to shorten or lengthen the
chain.
m Modification of the machine only by a specialist
workshop.
GB/CY
7

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis