Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning/Filling With Oil - Honeywell RABO Betriebsanleitung

Drehkolbengaszähler
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 35

3.7 Commissioning/Filling with oil

CAUTION!
The meter must be filled with oil before commissioning.
Vertical installation
Fig. 11 | Installation, maintenance and inspection positions
1
Oil filler neck
2
Oil-level gauge glass or oil-level inspection plug/borehole for initial inspection
3a
Oil drain sleeve (horizontal)
Meter size
G16 to G100
G160 to G400
G16 to G400
G16/G25
Measuring range
1:100
-25°C to +70°C
Table 4 | Oil types and quantities
To insert oil:
The meter must be depressurized in order to be filled with oil.
Unscrew the oil filler neck (Fig. 11 | No. 1) depending on the installation
position of the meter.
If an oil-level inspection plug (Fig. 11 | No. 2) is fitted, unscrew it.
Insert the oil specified in Table 4 through the oil filler neck using the
supplied syringe (inspection kit ID No. 73016605 or 73014893).
730xxxxxe
© Elster GmbH | All rights reserved. Subject to modification
1
2
3a
3b
3b
Oil drain sleeve (vertical)
Flow direction
Horizontal
Vertical
Horizontal
Vertical
Oil type
Shell Morlina S2 BL 10
Molyduval Chemlube 315
Horizontal installation
Filling quantity
[ml]
25
100
25
150
Honeywell
23

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis