Herunterladen Inhalt Inhalt Diese Seite drucken

Perel EVM77 Bedienungsanleitung Seite 5

Ir-zakthermometer
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 20
How to Measure the Ambient Temperature
Press the SCAN button. Press the Tamb button to select the ambient temperature measurement mode. Press the SCAN button to measure.
Read the measured temperature value from the LCD display. Release the SCAN button. The thermometer will automatically power off after
20 seconds. To measure again, press the Tamb button again and restart the ambient temperature measurement procedure.
NOTE: The measurement accuracy will be affected when measuring the temperature of reflecting objects. Apply some black tape to the
object and wait for the tape to adopt the object's surface temperature before measuring.
How to Select the Measuring Unit
Remove the batteries and set the measuring unit switch to the desired unit.
8. D:S Ratio
The thermometer has a visual angle and a visual spot size. Make sure the target is larger than the unit's visual spot size. The smaller the
target, the closer you should be to it. The relationship between distance and spot size is 6:1.
EVM77_v2
Units in mm, D = distance, S = spot size
5
PEREL

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis