Herunterladen Inhalt Inhalt Diese Seite drucken

Safety Instructions - Perel EVM77 Bedienungsanleitung

Ir-zakthermometer
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 20
1. Introduction
To all residents of the European Union
Important environmental information about this product
This symbol on the device or the package indicates that disposal of the device after its lifecycle could harm the environment.
Do not dispose of the unit (or batteries) as unsorted municipal waste; it should be taken to a specialized company for recycling.
This device should be returned to your distributor or to a local recycling service.
Respect the local environmental rules.
If in doubt, contact your local waste disposal authorities.
Thank you for choosing Velleman! Please read the manual thoroughly before bringing this device into service. If the device was damaged in transit,
don't install or use it and contact your dealer.
The EVM77 is non-contact thermometer with data-hold function, backlight and auto power off.

2. Safety Instructions

CAUTION – Laser Radiation – Do Not Stare Into Beam – Class 2 Laser
Wavelength: 650-685nm – Max. Output Power: < 1mW – EN60825 – 1:1994 + A2:2001 + A1:2002
Damage caused by disregard of certain guidelines in this manual is not covered by the warranty and the dealer will not accept
responsibility for any ensuing defects or problems.
Do not switch the device on immediately after it has been exposed to changes in temperature. Protect the device against damage
by leaving it switched off until it has reached room temperature.
Avoid exposing the EVM77 to electromagnetic fields, dust and extreme temperatures.
EVM77_v2
EVM77 – POCKET IR THERMOMETER
2
PEREL

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis