Herunterladen Inhalt Inhalt Diese Seite drucken

Setting Up The Blender; Installation; Before You Begin - Hamilton Beach Summit Series Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 76
A-840083400B-ENv01 11/30/01 3:57 PM Page 6

Setting Up the Blender

Installation

wWARNING
Electrical Shock Hazard
Plug into a grounded outlet.
Do not remove ground.
Do not use an adapter.
Do not use an extension cord.
Failure to follow these instructions
can result in death, fire, or
electrical shock.

Before you begin

Select the installation location carefully. The
following guidelines must be followed when
selecting a suitable location:
• The Quiet Shield™ requires at least
508 mm of clearance between the
countertop and any overhead cabinets.
Allow a minimum of 127 mm of clearance
behind the unit.
• The unit should be installed within 1.2 m
of a grounded outlet equipped with a
Ground Fault Circuit Interruptor.
• The countertop should be level and
stable, and capable of supporting
the blender.
• If multiple units are being installed side-
by-side, allow at least 406 mm center to
center between units.
• Take proximity to customers, closeness to
ingredients, and sufficient workspace into
consideration when selecting a location.
6
Installing the Blender
1. Once a suitable location has been
selected, place the blender base on
the counter. DO NOT plug it in at
this time.
2. Install the Quiet Shield according to the
instructions on page 7.
3. Check to make sure there is sufficient
clearance for the Quiet Shield to open
and close properly.
4. Plug the blender into a grounded three-
prong outlet equipped with a Ground
Fault Circuit Interruptor.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis