Herunterladen Inhalt Inhalt Diese Seite drucken

Panasonic S-36PN1E5 Installationsanleitung Seite 7

Single split air conditioner
Vorschau ausblenden Andere Handbücher für S-36PN1E5:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 74
3. SELECTING THE LOCATION FOR THE INDOOR UNIT
3-1. Required Minimum Space for Installation and Service.
Provide a check port on the piping side ceiling for repair and maintenance.
Install the indoor unit once the following conditions are satisfied and after receiving the customer approval.
1. The indoor unit must be within a maintenance space.
2. The indoor unit must be free from any obstacles in path of the air inlet and outlet, and must allow spreading of air
throughout the room.
Top view
(Unit:mm)
If the height from the floor to ceiling exceeds three meters, air flow distribution deteriorates and the effect is
decreased.
POSITION OF SUPENSION BOLT
(Unit:mm)
TYPE
S-36PN1E5
S-45PN1E5
S-50PN1E5
S-60PN1E5
S-71PN1E5
S-100PN1E5
S-125PN1E5
S-140PN1E5
P07-T11630.indb 7
P07-T11630.indb 7
Control box
Inspection hole
(600 x 600)
600
600
<Front>
A
B
A
B
C
D
E
840 780 523
64
650
1060 1000 523
64
650
1260 1200 523
64
650
Front view
Above 250cm
Apply a joint-canvas between the unit and duct to absorb unnecessary
vibration.
Install the unit leaning to a drainage hole side as a figure for easy water
drainage.
Caution
Remove the absorber at air return
hole before installation.
Absorber
7
1~3mm
Drainage hole
Fig.3-1
Fig.3-1.1
2/27/2012 9:20:57 AM
2/27/2012 9:20:57 AM

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis