Herunterladen Inhalt Inhalt Diese Seite drucken

Perel Tools EVM760 Bedienungsanleitung Seite 10

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 35
Continuity
Range
Open Circuit Voltage: ± 2.8V
Overload Protection: 250V DC or AC RMS
Resistance
Range
200Ω
2k Ω
20k Ω
200k Ω
2M Ω
20MΩ
Open Circuit Voltage: 0.25V
Overload Protection: 250V DC or AC RMS
Capacitance
Range
20nF
2µF
200µF
Open Circuit Voltage: ACV 50mV
Overload Protection: 250V DC or AC RMS
Diode
Range
Forward DC Current: ±1mA
Reversed DC Voltage: ± 3.0V
Overload Protection: 250V DC or AC RMS
Transistor hFE
Range
hFE
Display reads approx. hFE value (0 ~ 1 000) of transistor under test
NPN or PNP
Base Current: ± 10µA
Vce: ± 2.8V
For more info concerning this product, please visit our website www.velleman.eu.
The information in this manual is subject to change without prior notice.
EVM760
Built-in buzzer will sound if resistance < 50Ω
Resolution
0.1Ω
0.001k Ω
0.1k Ω
0.1kΩ
0.001k Ω
0.01k Ω
Resolution
10pF
1nF
100nF
Resolution
1mV
Display reads approx. forward voltage of diode
Function
Accuracy
± (0.8% of rdg + 3 digits)
± (1.0% of rdg + 2 digits)
Accuracy
± (2.5% of rdg + 20 digits)
Function
Function
(all types)
10
PEREL

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis