1. Introduction
To all residents of the European Union
Important environmental information about this product
This symbol on the device or the package indicates that disposal of the device
after its lifecycle could harm the environment. Do not dispose of
the unit (or batteries) as unsorted municipal waste; it should be
taken to a specialized company for recycling. This device should be
returned to your distributor or to a local recycling service. Respect
the local environmental rules.
If in doubt, contact your local waste disposal authorities.
Thank you for choosing Velleman! Please read the manual thoroughly before
bringing this device into service. If the device was damaged in transit, don't
install or use it and contact your dealer.
The EVM830 is a compact pocket-sized multi-meter with a 3 1/2 digit LCD for
measuring AC and DC voltages, DC currents, resistance, transistors and diodes.
Full overload protection is provided. It is the ideal instrument for hobbyists, for
use in the field, for laboratories and workshops and for domestic applications.
1.1 Warning
Treat this device with the utmost caution as improper use may result in injury or
death. In addition to normal safety precautions for dealing with electrical
circuits, the user should also follow the safety precautions suggested in this
manual to the letter. Do not use this device if you are unfamiliar with electrical
circuits and testing procedures.
This device is not designed for commercial or industrial use.
Refer to the Velleman® Service and Quality Warranty on the last pages of
this manual.

1.2 Safety Precautions

This multi-meter is designed to ensure the safest operation possible.
Nevertheless, safe operation depends on you, the operator. Follow these simple
safety rules:
Never apply a voltage to the multi-meter that exceeds 500VDC or 500VAC
rms between an input jack and ground.
Use extreme caution when working with voltages above 60VDC or 30VAC
rms.
Always discharge the filter capacitors in the power supply circuit under test
before attaching the test leads.
Never connect a voltage source to the EVM830 when the device is in the
DCA, ACA, resistance or continuity mode.
Always turn off the power and disconnect the test leads before replacing the
battery or fuse.
Never operate the multi-meter unless the battery cover is in place and fully
closed.
When carrying out measurements on TV's or switching power circuits, always
remember that there may be high amplitude voltage pulses at test points
which may damage the meter.
EVM830

USER MANUAL

3
Rev. 01
©Velleman nv