Herunterladen Inhalt Inhalt Diese Seite drucken

GE M-Pact Plus Installation Und Betriebsanleitung Seite 119

Inhaltsverzeichnis

Werbung

10000
Ir = 0.4 to 1.0 x In
in steps of 0.1In
1000
100
10
1
0.1
0.01
1
1000
100
10
1
0.1
0.01
0.01
*Overload & delayed short circuit curves @ Ir=1.0xIn
** N=I/Ir for overload & delayed short circuit
N=I/In for instantaneous & ground
APPENDIX - B
APPENDIX - B
APPENDIX - B
APPENDIX - B
APPENDIX - B
Trip Curv v v v v es*
Trip Cur
Trip Cur
Trip Cur
Trip Cur
MPr
MPr
MPro Plus - Frame1 & Frame2
MPr
MPr
o Plus - Frame1 & Frame2
o Plus - Frame1 & Frame2
o Plus - Frame1 & Frame2
o Plus - Frame1 & Frame2
(2500 used as example with tolerance)
M-PRO 17 IEC 947 Class 20 Long Time Protection
CURRENT IN MULTIPLES OF Ir
M-PRO 17 EARTH LEAKAGE PROTECTION (UEF)
Earth Fault pickup, If
0.4
0.6 0.8 1.0
0.1
1
CURRENT IN MULTIPLES OF In
es*
es*
es*
es*
Min/max settings
show n in BOLD
10
Min/max settings
show n in BOLD
10
119
APPENDIX
Trip delay settings
1.0
0.8
0.6
0.4
0.2
0.1
Inst
100
Trip delay settings
1.0
0.8
0.6
0.4
0.2
0.1
Inst
100
1000

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis