Herunterladen Inhalt Inhalt Diese Seite drucken

GRAPHITE PRO 59GP800 Betriebsanleitung Seite 18

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 22
DESCRIPTION OF DRAWING PAGES
Below enumeration refers to the device elements depicted on the drawing pages of this manual.
1. SDS Max chuck
2. Fixing sleeve
3. Locking ring for chisel setting
4. Switch lock button
5. Switch
6. Motor cover
7. Auxiliary handle
8. Locking knob for auxiliary handle
* Differences may appear between the product and drawing.
MEANING OF SYMBOLS
CAUTION
WARNING
ASSEMBLY / SETTINGS
INFORMATION
EQUIPMENT AND ACCESSORIES
1. Auxiliary handle
2. Chisels (point and flat)
3. Grease tube
4. Cloth
5. Carrying case
SETTING THE AUXILIARY HANDLE
Due to safety reasons always use auxiliary handle when operating the demolition hammer.
Auxiliary handle can be fixed at any point on the hammer casing circumference and features stepped
adjustment of its position.
● Loosen the locking knob for auxiliary handle (8).
● Rotate the auxiliary handle (7) on the hammer casing circumference to the most comfortable position
considering the work at hand.
● Pull the auxiliary handle (7) away from the hammer casing and set up in appropriate position (fig. A).
● Tighten the locking knob for auxiliary handle (8) to fix it securely.
INSTALLATION AND REPLACEMENT OF WORKING TOOLS
The hammer is designed to operate with working tools with SDS Max shanks. Prior to starting operation
clean the hammer and working tools. Use grease and apply thin layer onto shank of the working tool
(fig. B). It will improve tool durability.
Disconnect the power tool from power supply.
● Put the hammer against work bench.
● Hold the fixing sleeve (2) of the SDS chuck (1) and overcome the spring resistance to pull it to the back.
(Refer to the graphic symbols on the fixing sleeve.)
● Insert working tool shank into chuck and slide it to mechanical stop (it may be necessary to turn the
working tool so it can reach appropriate position) (fig. C).
● Release the fixing sleeve (2), it will finally lock the working tool.
- 1 pce
- 2 pcs
- 1 pce
- 1 pce
- 1 pce
PREPARATION FOR OPERATION
18

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis