Herunterladen Inhalt Inhalt Diese Seite drucken

Duke FBB Bedienungsanleitung Seite 7

Full performance maintenance instructions (flexible batch broiler)
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

FULL PERFORMANCE MAINTENANCE CHECKLIST
Restaurant Number:
Address:
City:
State:
Zip:
CHECKED AND OKAY
MAY REQUIRE FUTURE ATTENTION
REQUIRES IMMEDIATE REPLACEMENT
COMPONENT CHECK
1
Inspect Power cord and plug
2
Inspect Catalyst ( if applicable ). Instruct on proper care
3
Inspect all Panels, removable parts, and ensure casters are secure
4
Inspect Lower Burner / Any spare Lower Burners
5
Inspect Flame Arrestor / Any spare Flame Arrestors
6
Inspect and clean Blower Motor Hose (with Duke recommended cleaner)
7
Replace Motor
8
Remove and inspect Air Adjustment Cover. Clean Cones, Bolts, and IR Burner inlets
9
Replace IR Burner Orifices / Holder
a) Refer to instructions for orifice sizes
10
Replace Lower Burner Orifice
a) Refer to instructions for orifice sizes
11
Replace (1) Lower and (2) Upper Igniters
12
Replace (1) Lower and (2) Upper Flame Sensors
13
Clean Flame Sensor Tubes with brush (with supplied brush)
14
Inspect and clean (1) Lower and (2) Upper Ignition Cables
15
Clean Temperature Probe (with supplied alcohol pads and scrub pad)
16
Clean Temperature Probe Tube (with supplied brush)
17
Inspect Cook Chain for damaged links
18
Inspect Drive Chain and Drive Sprockets
19
Inspect Drive Motor. Clean wire connections (with Duke recommended cleaner)
20
Inspect (4) Teflon Bushing Blocks for wear
21
Clean any grease accumulation in electrical control compartment, including wire connections (with Duke
recommended cleaner)
22
Ensure all wire connections are firmly seated
23
Confirm Troubleshooting Label is in place on Control Compartment
FBB ( FLEXIBLE BATCH BROILER )
Model:
Serial Number:
PM Date:
Service Company:
Technician Name:
Service Co. Phone:
FRONT IR Burner
Orifice Size:
LOWER Orifice
Size:
REAR IR Burner
Orifice Size:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis