15.
Mount this part with glue or screws to the frame.
16.
Make sure that the larger ceiling part can pass the fixed ceiling. It may not have a constructional dead
end.
17.
The lift is ready to be adjusted. Refer position 16 for further details.
18.
For adjusting the build-in and presentation position of the lift, the 2 black knobs on the back-side of lift
must be used.
Rotate step by step the knobs to ensure a right position for the lift.
Adjusting the UP limit (build-in height).
Lower the lift for about 200 mm (20 cm).
Rotate the Up-knob to the left, the build-in height will decrease.
Rotate the Up-knob to the right, the build-in height will increase.
Adjusting the Down limit (projection height).
Lower the lift for about 200 mm (20 cm).
Rotate the Down-knob to the left, the projection height will decrease.
Rotate the Down-knob to the right, the projection height will increase.
19.
The maximum running time for the lift is 4 minutes. When the lift is activated longer than 4 minutes, it
will stop cause of overheating. The motor has a build-in protection, but will only work for a short period
of time. When this type of alert happened very often the motor will get damaged.
***
Dimensions are indications, not to be used for any preparations. No rights can be derived from the
above dimensions.