Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Installation Into The Sks Base Unit; External Installation - axing SKZ 5-01 Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Operating instructions | SKZ 5-01/-03/-04 | SKZ 6-00 | Power supply units for head-ends

2. Installation

2.1.

Installation into the SKS base unit

 To mount the power supply unit, use the screws (1) provided for that purpose.
 Fasten the mains cable with the strain-relief clamp (2).
2.2.

External installation

 Install the power supply unit on a flat surface.
 The power supply unit can be fixed by inserting 2 suitable screws into the top and bottom mounting holes
(1).
 Perform equipotential bonding as prescribed. The fixing screw (2) is intended for this.
6
2016-06-01 | © AXING AG Switzerland | We reserve the right not to be liable for any changes in design and layout, errors and misprints

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Skz 5-03Skz 5-04Skz 6-00

Inhaltsverzeichnis