Herunterladen Inhalt Inhalt Diese Seite drucken

Installation And Use; Display Orientation - CEMO CMT10 Bedienungs- Und Wartungshandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
GB
STANDARD

3. Installation and use

The meter is supplied with a calibration
carried out for liquid diesel at +20 °C.

3.1 DISPLAY ORIENTATION

CMT 10
1. Put the in-line flow meter display down on a flat,
dry and clean surface
2. Unscrew the 4 screws on the back on the meter
and remove the cover
3. Unplug the two PCBs , rotate one by 180° and
reconnect making care that all PIN are perfectly
aligned.
4. Reposition the cover, taking care to the switch
buttons position
5. Screw the 4 screws removed initially.
CMO10
1. Unscrew the four screws that secure the bezel
to the flowmeter body.
2. Turn the template into the desired position, being
careful not to damage or disconnect the signal
cable between display and REED sensors..
3. Tighten the 4 screws that secure the bezel to the
flowmeter body.
i
IT'S NECESSARY, IF NOT ALREADY
PRESENT IN THE GROUP, TO INSTALL
A PROTECTIVE FILTER AT THE INLET
OF THE METER, SMALLER THAN
40 MESH.
6
CMT 10
RETROFIT
CMO 10
STANDARD
CMT 10
A
B
CMO 10
A
RETROFIT
2.5
C
D

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Cmo10

Inhaltsverzeichnis