Herunterladen Inhalt Inhalt Diese Seite drucken

EOS LSG 18 Montage- Und Gebrauchsanweisung Seite 9

Vorschau ausblenden Andere Handbücher für LSG 18:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Power switchgear installation
Please follow the instructions below for instal-
lation:
1. Remove the bottom cover of the power
switchgear. To do so, completely remove the
3 screws and pull the bottom housing cover
first down, then forward (Fig. 1).
2. Drill the holes for the supplied 4 x 25 mm
wood screws according to the dimensions
shown in Fig. 2.
3. Screw one of the wood screws into the top
centre hole. This is the screw the contactor
box will be hooked onto. The screw should
therefore protrude by about 3 mm (see de-
tail in Fig. 2).
4. Mount the power switchgear on the screw
protruding by 3 mm and into the upper
mounting hole.
5. Firmly attach the bottom part of the housing
to the cabin wall if possible using the two
bottom holes (Fig. 2).
6. Insert the cable glands and grommets from
the package in the openings of the bottom
part of the housing (you can choose to insert
from below or the back), then feed the con-
necting cables through these openings.
7. Restore the bottom housing cover by return-
ing the screws to the 3 holes provided for it
(Fig. 3).
Mind to keep the
ventilation
distance to the wall
Fig. 1
Fig. 2
Fig. 3
EN
2.
1.
9

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Lsg 18 h

Inhaltsverzeichnis