Herunterladen Inhalt Inhalt Diese Seite drucken

Operation - Sundirect OC2000 Installations & Bedienungsanleitung

Outdoor infrarotheizstrahler
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Step1: Drill 4 holes to the wall according to the holes on Part A and tighten Part A to the wall using
Part B.
Step2: Fix Part H to the heater by using Part D, Part E and Part F. Use Part F to regulate the position
level of the heater and Part D and Part E to tighten and secure.
Step3: Slide Part H into Part A.
Step4: Screw Part C into the hole on the bottom of Part H and finish the installation.

Operation

Turn on the heater by touching the switch on the side of the heater, now the heater is in stand-by
position.
Then power on by touching the Power button on the remote control (Part G). The signal light will
turn from red to green. Then you can regulate the heater with 2 power levels. 

Level I means the heater is running on 50% power.
Level II means the heater is running on 100% power.
Choosing Level I, the signal light on the heater will have one green light.
Choosing Level II, the signal light on the heater will have two green lights. 

Make sure the remote control is close enough to control the heater, otherwise please operate in a
closer distance.
8

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Oc2500

Inhaltsverzeichnis