10-5-2. Fixing the cables in place
Route the cables as shown in the figures below.
・(E)P200 to 300
Main Box
Transmission terminal block
Rubber bushing
(for main inverter connection
wiring (200 V) and unit wiring
(solenoid coil wiring))
Tie band
(Supplied)
Rubber bushing 2
Unit wiring (sensor wiring)
・(E)P350 to 550
Transmission terminal block
Rubber bushing
(for Fan cable and unit wiring
(solenoid coil wiring))
Tie band
(Supplied)
Rubber bushing 2
Unit wiring (sensor wiring)
WT08432X01
Main inverter
connection wiring
(low voltage)
Fill the gap.
Fill the gap.
GB-50
Inverter Box
Power supply terminal block
Cable strap
Rubber bushing
(for FAN cable)
Tie band
(Supplied)
Rubber bushing 1
Power cable
(not supplied)
Transmission cable (not supplied)
The length of the section after the cable
access hole must be at least 1100 mm (43 in).
Power supply terminal block
Cable strap
Tie band
(Supplied)
Rubber bushing 1
Power cable
(not supplied)
Transmission cable
(not supplied)