Herunterladen Inhalt Inhalt Diese Seite drucken

Floor&Ceiling [Rznc(50/70/100/120/140/160)] - Baxi RZNK50 Installations- Und Hilfehandbuch

Split-klimaanlage mit dc-inverter mono
Vorschau ausblenden Andere Handbücher für RZNK50:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 93
4.2.3. FLOOR&CEILING [RZNC(50/70/100/120/140/160)]
Installation space
Please be sure to meet the following installation space requirements when selecting the
installation site:
Ceiling installation
Location of the hosting bolt
MODEL
50
70
100
120
140
160
Ceiling installation
1. The suspension foundation must be firm and reliable to bear the weight of more than
200 kg and capable of bearing vibration for long periods.
2. The suspension of the indoor unit should carried out as described below:
a. Adjust the relative positions of the suspension hooks to ensure the indoor
unit is level in all directions. Use a spirit level to ensure this, otherwise water
leakage will happen.
b. Tighten the nuts and ensure that the hooks are tightly connected to the nuts.
c. After the unit is installed ensure it is secure and does not shake or sway.
A
B
929
841
1280
1192
1631
1543
20
Floor installation

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis