Herunterladen Inhalt Inhalt Diese Seite drucken

Filling The System; Evacuating Air While Filling The System - Vasco NIVA FC series Installationsanweisung

Gebläse konvektor
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 36
1
2
A
B
C
D
E
FILLING
THE SYSTEM
F
EVACUATING AIR
1
2
WHILE FILLING
THE SYSTEM
FILLING THE SYSTEM / EVACUATING AIR WHILE FILLING THE SYSTEM
MOUNTING THE CONDENSATION DISCHARGE PIPE
3
Connect a pipe adequately to the discharge fitting (A) of the condensation
collection tray. Check that the extension drip (B) is present and correctly
installed.
B
A
When starting up the system, make sure that the hydraulic unit lockshield is
open When electric power is still switched off, but the thermo-valve has already
been powered, use the special cap to press the valve stopper to open.
-
Open all the system interception devices (manual or automatic);
-
Start filling the device by slowly opening the system water filling tap;
-
Take a screwdriver and act on the breather of the battery;
3
-
When water starts coming out of the breather valves of the appliance, close
them and continue filling until reaching the nominal value for the system.
Check the hydraulic seal of the gaskets.
It is advisable to repeat these operations after the appliance has been running
for a few hours and periodically check the pressure of the system.
4
5
A
discharge fitting
B
tube for the outflow of the liquid
ISO
4
A
A
Venting of the battery
6
7
ø14mm
PROJECT
99 Ventilo
BENAMING
Ventilo Niva SL600
Tel. +32 (089) 79.04.11
B 3650 DILSEN
Fax. +32 (089) 79.05.00
8
NL
FR
DE
EN
IT
PL
MACHINE NR.
DATUM
25/08/2017
TEKENING NR.
xx
SCHAAL
(1:2
09

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Niva fc115Niva fc75Niva fc95

Inhaltsverzeichnis