Herunterladen Inhalt Inhalt Diese Seite drucken

Yealink CP930W-Base Schnellstartanleitung Seite 6

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

E
N
G
Assembling the DECT Phone
W60B Package Contents
L
I
S
H
1. Connect the base station power and the network using method a or method b.
a. AC Power Option
Note:
• If you choose method a, use Yealink-supplied power adapter (5V/600mA). A third-party
power adapter may damage the base station.
• If you choose method b, you do not need to connect the power adapter. Make sure the
hub/switch is PoE-compliant.
2a. (Desktop Installation) Attach and remove the base stand.
Attach the Base Stand
Align the snap-fits with the corresponding holes
and push forward, snapping them into the holes.
2b. (Wall-Mount Installation) Attach the base station.
2
b. PoE (Power Over Ethernet) Option
Remove the Base Stand
Remove the snap-fits from the
holes horizontally.

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Cp930w

Inhaltsverzeichnis