Herunterladen Inhalt Inhalt Diese Seite drucken

Gallagher M1200i Betriebsanleitung Seite 16

Vorschau ausblenden Andere Handbücher für M1200i:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 47
HANDY HINT
Testi ng the earth system
a)
Turn the energizer off . At least 40m (130ft ) along the fence line drive a steel
stake into damp soil and connect it to the fence wire.
b)
Turn the energizer on and wait 30 seconds. Check the earth system voltage
using the navigati on keys. The earth voltage should be 0.2 – 0.3KV or less. If
it is higher add earth stakes unti l 0.2-0.3KV is achieved. In dry conditi ons or
areas with low mineral content soil an earth return system may be required as
described in the Gallagher Power Fence™ Manual or go to www.gallagherams.
com.
Adjusti ng the energizer output voltage
a)
Press the setup butt on (
butt ons ( < or >) to highlight the quickscan bargraph display (it will start
fl ashing).
b)
Press (+ or -) to adjust the output voltage up or down. The output voltage can
be adjusted from 4.5KV to 8KV. The factory default setti ng is 8KV.
c)
To exit the setup mode wait 10 seconds or press the setup butt on (
16
Gallagher 3E2488 M1200i Energizer User Manual
) to enter setup mode and use the navigati on
Controller showing the output voltage being adjusted
).

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis