Herunterladen Inhalt Inhalt Diese Seite drucken

Gallagher M1200i Betriebsanleitung Seite 10

Vorschau ausblenden Andere Handbücher für M1200i:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 47
Step 3. Connect the fence
a)
Connect the energizer's red output (
Underground Cable (G627). Remove 5cm (2") of plasti c coati ng from one end
of the cable. Unscrew the red (FENCE) terminal and insert the wire through the
terminal slot. Screw the terminal closed, ensuring the wire is fi rmly clamped.
b)
Att ach the other end of the cable to the fence using a Joint Clamp (G603).
For instructi ons on fence installati on see the Gallagher Power Fence™ Manual or go
to www.gallagherams.com
Step 4. Turn the Energizer On
Plug the energizer into a power outlet and switch ON.
Check that the Power On LED on the front of the energizer is green.
IMPORTANT: Readings will change as the fence conditi ons change. This is the
Energizer monitoring the fence and Energizer performance. Read the secti on
"Understanding your M1200i Energizer Controller" (p10) for a complete
understanding of the display and alarms.
10
Gallagher 3E2488 M1200i Energizer User Manual
) terminal to the fence using

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis