Herunterladen Inhalt Inhalt Diese Seite drucken

Components; Assembly Procedure - Panasonic TY-ST43PE8 Bedienungsanleitung

Sockel
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 19

Components

Note
Properly dispose of the package after unpacking the product.
Base (2)
Left and right parts are identical.
Pedestal bracket (2) *
Left and right parts are identical.
* : Pedestal brackets
Overturn-prevention parts
Overturn-prevention belt (2)
Wood screw (2)
The images shown in this manual are for illustrative purpose only.
Specifications of the product are subject to change without notice.
● Safely store small parts to keep them out of the reach of infants and young children.
● Manage screw tightening torques according to the torques specified in the assembly procedure.
● In tightening screws, use such a tool as a torque screwdriver or torque wrench. Do not use an electric screwdriver
and impact screwdriver.

Assembly Procedure

1. Preparing the display
Installation must be carried out by at least two
people.
Spreading out a soft cloth, etc., place the display
with the screen facing down.
● Be careful not to damage the display screen, for
example, by dragging it.
● When placing the display with the screen facing down,
or lifting it up, never hold or put pressure on the LCD
screen. The LCD screen may be damaged.
16
and display installation screws
Check that all the parts are accounted for and present in
their designated quantities.
Base installation screw (2)
Display installation screw (6) *
are not used for LF8/LF80 series (Display).
Protective sheet
(M4 × 28)
(M4 × 10)

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis