Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Operation; Troubleshooting - Steinbach speedsolar sun Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für speedsolar sun:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
EN
filter installation is left running during the night, it is possi-
ble that it cools down the pool.
3)
Before setting up the solar panel, leave the panel in the
sun for one hour. Then connect the two angle couplings
and the end caps according to the installation diagram:
4)
Start the pump. If the collector turns cold despite the sun,
everything has been installed properly.
5)
Solar panel are often installed on rooftops. Even if you are
familiar with working on rooftops, please have the panels
installed by a specialist. To prevent accidents, please
make sure that safety guidelines are followed while in-
stalling the solar panel on rooftops or heightened struc-
tures.
6)
When installing the solar panel on the ground, please
make sure to position it in a way that children thereby
cannot enter the pool.
Connection Possibility:
When connecting the main pipe and the
angle, you must use one gasket ring at
a time. Turn the angle coupling until it is
attached firmly (see diagram).
Assembly of small angle-coupling: (Picture 3)
Assembly of large angle-coupling: (Picture 4)
1) Install the two end caps in the same way as the angle
couplings.
2) Always follow the assembly instructions. The solar panel
will not work otherwise, furthermore damage of the so-
lar panel may arise which is not covered by warranty.
3) Before assembling the solar panel, please read the
assembly instructions carefully.
Place the heater in a location where it will receive the greatest
amount of sunlight, but keep a sufficient minimum distance from
pool.
Always ensure that the solar panel faces in a SOUTHERLY direc-
tion, and that solar radiation on the solar panel is unrestricted
throughout the day. Make sure that the solar radiation is not dis-
turbed by plants or other obstacles.
Ensure ALL hose connections are tight and the hoses are NOT
kinked or bent at severe angles. If the hoses are leaking, check to
make sure ALL of the parts that have O-Rings have them attached
and are screwed on tightly. DO NOT over tighten hose clamps (15
kg max torque).
Speedsolar Pool Solar Panel | 2015_V1
Large angle:
connect with the gasket
ring, insert the end and
turn until it is attached
firmly
Small angle:
connect with the gasket
ring, insert the end and
turn until it is attached
firmly
(Picture 2)
5

Initial Operation

Once the solar panel has been assembled and the hoses are con-
nected to the filter pump and pool return, unblock the flow of water
into the pool return hose and turn on the pump and filter system.
Bubbles will shoot out of the return nozzle into the pool initially while
air is pushed out of the solar panel. If this persists for longer than 2
or 3 minutes, check for and repair any leaks in the hoses or connec-
tions.
NOTE: Be sure to place your pool cover on at night to prevent heat
loss.
6

Troubleshooting

Probleme
Possibilities/Solutions
The pool water is not
 Check to make sure that water is
heated.
flowing through the tubes.
 Has it been sunny?
 Use the maximum possible solar ra-
diation and increase the running
time of the filter pump.
 Put your pool cover on at night to
prevent heat loss.
Additional panels may be necessary.
No initial bubbling after
Check the setting of the filter system
panel is connected and
to make sure it is returning water to
pump is on.
the pool through the filter pump,
then through the solar panel and af-
terwards through the connection
hose back to the pool.
Bubbles
continue
to
 Check the connection hoses for
flow out of the pool wa-
ter inlet well after the
pump has been turned
.
on
 Check the connector seals in
Leaking heater.
 Check if the hose clamps have
7
Service Processing
For technical information, missing parts or in the case of a complaint,
please contact our customer service:
Steinbach VertriebsgmbH, Aistingerstrasse 2, 4311 Schwert-
berg, Austria
Tel. Austria: (0820) 200 100 106 (0,145€ per minute from all net-
works)
Tel. Germany: (0180) 5 405 100 106 (0,14€ per minute from land-
line, mobile radio max. 0,42€ / minute)
FR/IT/CZ/HU/HR/SK/SLO/RO/BG/TR: +43 (0) 7262 / 61431-0
e-mail: service@steinbach.at
www.steinbach.at
possible damages.
Check if the hose clamps have
been tightened enough.
the pipeline system.
been tightened enough.
Check the connection hoses for
cracks.
Page 5 of 31

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis