Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Instructions; Important Information; Scope Of Delivery; Important - Garantia 202040 Einbauanleitung

Trinkwasser-nachspeisemodul
Vorschau ausblenden Andere Handbücher für 202040:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

1.1

Scope of delivery

Installation instructions

Drinking water intake module including the following parts:
Changeover valve, 1''
Float valve, ¾"
Domestic water works, fitted on pump console
Floating switch with 20 m connection cable and adaptor plug
Special DN 70 seal with emergency overflow and odour trap
Round lid to cover inside
Fastening kit
1.2

Important

Read and comply with the following information and explanations carefully before installing and
commissioning!
Do not plug in the mains plug until you have
correctly fastened the GARANTIA drinking water intake module and
checked the water connections (inlet, overflow and extractor) for any leaks.
We recommend bringing in a specialist in the sanitary or installation trade to install the module.
To avoid overflowing cellars, which can be caused by improper handling or an act of God, it is
recommended to install the module in a cellar which has a drain in the floor.
The inside of the container for the drinking water intake module should be clean (important if the
system has been stored for a period of time or if there is any construction dust). There may also
be a small volume of residual water in the container from the final inspection. The container must
be rinsed before commissioning.
Use the sealing Teflon tape and installation hemp to seal the screw connections.
All inlet lines, drainage lines and power supply lines must be laid depressurised and without strain
and must be connected in a freely accessible manner.
When undertaking these installation steps, remember that the flood level is the same as the street
level. If you have any questions, contact your local building authorities.
You cannot make a warranty claim if you do not comply with these instructions!
The corresponding earthing type plugs should be disconnected from the mains!
The mains plug must be freely accessible!
1.3

Area of application

The device is approved for operating
with 230 volt 50 Hz AC voltage and
for controlling rainwater harvesting systems
1.4

Responsibility

The operator assumes full responsibility for all measures
to ensure correct installation and
to prevent dangers due to improper operation
NO LIABILITY WILL BE ACCEPTED FOR COSTS INCURRED DUE TO IMPROPER OPERATION OR
info@garantia.eu
www.garantia.eu

1. Important information

INSTALLATION.
11 / 27

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis