Herunterladen Inhalt Inhalt Diese Seite drucken

MC Crypt 59 08 00 Betriebsanleitung Seite 22

Dmx power pack
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Start-Up
Acceptance test (in case of industrial/public use):
Before first use and after any significant modifications, the installation (including the electrical
connections) must be checked by an official expert.
A yearly check by a technical expert is required.
At least every four years, a quality inspection must be carried out by an official expert.
Install the DMX Power Pack on level, fire-proof ground that is not subject to impacts.
Secure the device with assembly fastenings that are compatible with the fastening surface and suitable for
carrying the weight of the device.
Use all fastening holes at the devices for installation and ensure that the assembly fastenings create a firm
connection to the fastening surface.
Secure the installation with an additional suitable safety restraint cable or a safety net. The safety restraint cable
or net must be able to support the device if the main support system fails.
22

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis