Herunterladen Inhalt Inhalt Diese Seite drucken

EuroLite MB-1010 Battery Motor Bedienungsanleitung Seite 10

Vorschau ausblenden Andere Handbücher für MB-1010 Battery Motor:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Make sure that the area below the installation place is blocked when rigging, derigging or servicing the
fixture.
Operate the device only after having familiarized with its functions. Do not permit operation by persons not
qualified for operating the device. Most damages are the result of unprofessional operation!
Never use solvents or aggressive detergents in order to clean the device! Rather use a soft and damp cloth.
Please use the original packaging if the device is to be transported.
Please consider that unauthorized modifications on the device are forbidden due to safety reasons!
If this device will be operated in any way different to the one described in this manual, the product may suffer
damages and the guarantee becomes void. Furthermore, any other operation may lead to dangers like
burns, crash etc.
INSTALLATION
Inserting/Replacing the battery
Please refer to the explanations under Operating Determinations.
Open the battery cover on top.
If replacing the battery, remove the old battery from the battery compartment.
Caution!
Danger of explosion when battery is replaced improperly.
Only replace by the same type or similar types recommended by the manufacturer.
Remove empty battery in accordance with the instructions of the manufacturer.
Insert the battery and make sure that the poles are correct.
Replace the battery cover and close it.
If the device will not be used for a longer period of time, remove the battery in order to avoid battery leakage.
In order to have a long battery life, you should only use alcaline batteries.
BATTERY DISPOSAL NOTICE
Please dispose of old and used batteries properly.
Batteries are hazardous waste and should not be disposed of with regular domestic waste!
Please take old and used batteries to a collection center near you.
The installation of the mirrorball has to be built and constructed in a way that it can hold 10 times the weight
for 1 hour without any harming deformation.
When rigging, derigging or servicing the fixture staying in the area below the installation place, on bridges,
under high working places and other endangered areas is forbidden.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert before taking into operation for the first time and after changes before taking into operation another
time.
10/12
00026371.DOC, Version 2.2

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis