Installation – for qualified contractors
9.8.1 Connecting additional heating mats
Material losses
!
Only connect additional heating mats in parallel.
» Make sure that the total current does not exceed the
maximum switching current and breaking capacity of
the temperature controller.
» Information can be found in the operating and instal-
lation instructions for the temperature controller.

10. Commissioning

10.1 Initial start-up

After installing the heating mat and applying tile adhesive
or levelling compound, you must wait at least 2 days be-
fore switching on the heating mat for the first time.
» Switch on the heating mat for short periods over
several days once this initial drying phase has been
completed. This ensures that the tile adhesive and
levelling compound cure slowly.
» If you have laid impermeable synthetic floor cover-
ings, you must heat the floor for a period of approx.
36 hours. This ensures that there will be no residual
humidity left in the floor.
Note
Final commissioning can take place no sooner than
5 days after completion of the floor.

10.2 Commissioning report

» Make sure that you have completed the warranty
card and the installation diagram correctly. Observe
the following information:
◦ The installation diagram must show the exact posi-
tion of the heating mats, cold leads and temperature
sensor.
◦ Measured values from all three test measurements
must be entered on the warranty card.
» Enter the measured total resistance and insulation
resistance on both type plate labels.
» Attach the type plate label for the warranty card to
the specified position on this card.
» Attach the type plate label for the main junction box
in a highly visible location on this box.

11. Handover

Explain the functions of the appliance to the user. Draw
special attention to the safety instructions.
Hand over these operating and installation instructions
to the user.
Hand over the warranty card and installation diagram to
the user.