Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Bedienungs- und Wartungsanleitung für Handschweißextruder Serie HSK23/HSK30

8. Maintenance

General rules for all maintenance works:
During machine start-up, maintenance works as well as in continuous operation, the
appropriate directions of employer's liability insurance association on the subject of
accident prevention must be strictly followed.
Please check the connecting cable regularly in view of eventual damage!
We do not accept any liability for damage to persons or machine parts occurred by
insufficient maintenance works or improper greasing.
Please take into consideration that regular and thorough maintenance will increase
the lifetime of your manual welding extruder and avoid unnecessary standstills during
production.
For all repairs at the electrical devices please refer to the high-voltage tests as per
VDE 0740.

8.1 Cleaning

After 100 service hours or after 3 months at the latest the cooling slots at the motor
housing must be cleaned and the motor blown out with dry compressed air.
30
 HSK Kunststoff Schweißtechnik GmbH
Pull out mains plug!
Electrical parts to be cleaned without liquids!
Only use original spare parts!

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Hsk30

Inhaltsverzeichnis