Herunterladen Inhalt Inhalt Diese Seite drucken

Hose System; Heating Bath - IKA RV 8 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für RV 8:
Inhaltsverzeichnis

Werbung

Hose system

• Connect the water hoses (H
the counter-flow principle. (Fig. 20)
• Install the vacuum connections to the condenser, Woulff bottle,
vacuum controller with valve and vacuum pump.
• Always connect the vacuum hose (vac) to the condenser at the
highest point to minimize solvent losses during suctioning.
• Use standard laboratory vacuum hoses with an inside diameter
of 8 mm and a wall thickness of 5 mm (see accessories).
Heating bath HB 10
Refer
CAUTION
"Commissioning" in the heating bath
instruction manual !
• Assemble the foot of the heating bath HB10
For operation of the HB10 heating bath in combination with the
RV8, the foot plate supplied must be fitted to the heating bath.
Caution: It is not permitted to use HB10 heating bath fitted
with a foot plate in combination with any other type of rotary
evaporator.
O) to the condenser according to
2
Fig. 20
to
the
chapter
entitled
Unscrew the screw (Z) fully out of the foot. (Fig. 21a)
Press the foot with the pin and the O-rings on it into the hole in
the heating bath base plate as far as the stop.
Tighten the screw (Z) by hand. (Fig.21b)
• Place the heating bath on the stand of the rotation drive and
push it into the left position. (Fig. 22)
Z
Fig. 21a
Fig. 21b
Fig. 22
27

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis