On all models, there is standard self-levelling boiler installed.
EN
On all models, it is possible to drain all water of the boiler through
apposite tap.
All models have emergency buttons installed, in order to let the
groups work in case the card or button-panel break down.
All models are prearranged for the installation of electric cup heater
(on some models it is standard).
INSTALLATION
Make sure the connections to the water supply and power grid as
well as to the drain have been arranged in compliance with accept-
ed standards. Electricity needs to be done through a circuit breaker
fit for the power of the machine and provided by heat protection
and efficient ground connection (these works have to be done by
qualified people).
Check that the power voltage matches with the machine's voltage
before electrically connecting the machine. If such condition is miss-
ing, it is not answered for damages to things and/or people resulting
from failed compliance with the current safety regulations.
Before proceeding with the machine's water connection to the net-
work, let water flow
from the water system to remove possible residuals. Then, let water
flow through the water softener for about two or three minutes be-
fore connecting it to the machine.
SET UP
Once the water and power connection are completed, the machine
can be set going. It is recommended to check that there is sufficient
water in the boiler. Then, place the switch on position 1 through
hand load and wait for complete replenishment of the boiler. After-
wards, turn the grip in position 2 to insert the electric heating.
The water level in the boiler has to be between the MIN and MAX
indications. In the "Quadra" model, the water level is indicated by a
warning light (green MAX level – red MIN level).
During the heating stage of the machine (about 30 minutes), the
anti-suck valve will release steam for a couple of seconds, till the
valve closes.
16