Installation
9.3
Certificates and approvals
Declaration of Conformity
The product meets the requirements of the harmonized European standards.
As such, it complies with the legal specifications of the EC directives.
The manufacturer confirms successful testing of the product by affixing to it the
10
Installation
10.1 General information
• Before screwing in the electrode, make sure the assembly thread is clean and runs smoothly.
• Screw in the electrode finger-tight (3 Nm)! (Data only applicable if installing in Endress+Hauser
assemblies.)
• Also pay attention to the installation instructions provided in the Operating Instructions of the
assembly used.
Special instructions for the BP version
Before commissioning the electrode, you must remove the silicone seal from the junction. The system
can only measure the pH value properly when the seal has been removed.
10.2 CPS16D and CPS96D
Do not install the electrodes upside down. The inclination angle must be at least 15° from the
horizontal. A smaller inclination angle is not permitted as it could cause an air bubble to form in the glass
sphere and prevent the inner electrolyte from completely wetting the pH diaphragm.
A
15°
Fig. 5: Installation angle
A
Permitted orientation
B
Incorrect orientation
12
15°
B
a0003133
CPS16D/CPS76D/CPS96D
4
mark.
Endress+Hauser