Herunterladen Inhalt Inhalt Diese Seite drucken

BADU BADUJET Primavera Originalbetriebsanleitung Seite 93

Vorschau ausblenden Andere Handbücher für BADUJET Primavera:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
screwdriver to bend the two offset tabs towards the back.
(Fig. 17)
10. Lead the pneumatic hoses through the lower/outer openings
of the light cover (110), light ON/OFF left; pump ON/OFF
right. Align the light cover (110) central to the nozzle housing
(102.1) and fasten with four tapping screws (112). (Fig. 18)
11. Slide one O-ring (37) onto each pneumatic button (38/1;
38/2). Fasten the pneumatic hoses to the corresponding
buttons using the hose clamps (46). Insert the two pneumatic
buttons through the light cover (110) in the nozzle housing
and lock by turning it clockwise. (Fig. 18)
12. Primavera: Mount the cap for the volume (111) and air
regulator (21/1) by means of a rubber mallet and a protective
cloth. (Fig. 19)
Primavera Deluxe: Mount the cap for the air regulator (21/1)
by means of a rubber mallet and a protective cloth. Attach
the cap for the volume regulator and tighten the setscrew on
the straight square surface (hexagon key wrench size 2).
13. Connect or bond the jet pump (92) with the flexible suction
tube (105.1), adapter (97) and screwed connection (98; 99)
and at the intake side with the flexible pressure tube (106.1)
and special reducer (79) at the delivery side. (Fig. 20)
14. Connect the pump motor in accordance with the wiring
diagram.
Pay attention to the correct direction of rotation for
three-phase motors! Only carry out the direction of
rotation check when the pump is completely filled with
water!
15. Switching on and off from the pool using the pneumatic
buttons:
 Pump ON/OFF (38/1) - right-hand button
 Light ON/OFF (38/2) - left-hand button
16. Volume regulator from the pool with the rotary button (111):
 OPEN - Left rotation
 CLOSE - Right rotation
17. With the air regulator (21/1) air can be added to the nozzle
from the pool:
 OPEN - Left rotation
 CLOSE - Right rotation
01|2018
Installation
EN 31

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Badujet primavera deluxe

Inhaltsverzeichnis