Herunterladen Diese Seite drucken

Rewatec MONOLITH Einbau- Und Montageanleitung Seite 6

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation measurements of buoyancy protection for container MONOLITH:
A: Filling, e.g. excavation
B: Netting
C: Filling material
D: Max. ground water level
E: Slope angle
H eü
max H gw without
netting
Immersion depth
without netting
max H gw with
netting
Immersion depth
with netting
H pit
H eü: Height soil coverage
H gw: Height ground water resp. stratum water level, min. allowed distance to the ground
surface
H Trench: Necessary depth of the excavation
Auftriebsicherung / Buoyancy protection
250
350
450
1300
1200
1100
550
750
950
790
660
550
1060
1290
1500
2050
2150
2250
DOKK7302
F: Bedding of the filling material
G: Tank height
H: Pit height
I: Thickness of the bedding of the
netting with filling material
550
650
800
1000
850
700
1150
1400
1700
550
550
550
1600
1600
1600
2350
2450
2600
21.02.2010
1000
1300
1600
500
250
0
2100
2650
3200
550
1600
2800
3100
3400
6 / 8

Werbung

loading

Diese Anleitung auch für:

Tubus