Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Installation Preparations - Siemens LB 57564 Gebrauchsanleitung Und Montageanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Installation

The extractor hood is designed for
installation on the kitchen ceiling or on a rigid
suspended ceiling.
During installation, optional accessories may
also require fitting.
Observe the minimum distance between
hob and extractor hood (see "Safety
instructions")!
Avoid damaging the sensitive surfaces!
Preparing the ceiling
RISK OF INJURY,
DAMAGE TO PROPERTY
Before drilling the holes for the designated
installation location, check for concealed
electrical cables and other lines.
The ceiling must be level and horizontal.
The enclosed screws and wall plugs are
suitable for concrete and natural stone. Use the
appropriate fasteners for other ceiling
structures.
Ensure that the ceiling has adequate load
bearing capacity.
Ensure that the depth of the drilled holes
corresponds with the length of the screws.
Ensure that the wall plugs are secure.
Max. weight in kg: 50
Design subject to modification in line with
technical development.
30
Installing the upper support frame
1. Specify the total height of the support
frame before installation and mark the
screw holes. The height of the support
frame can be adjusted in 20 mm steps.
The total height is measured from the
height of the ceiling, the height of the
worktop and the corresponding distances
between the hob and extractor hood.
2. On the ceiling mark the centre point of the
extractor hood.
3. Using the enclosed template, mark the
positions for the screws on the ceiling.
4. Drill 4x 8 Ø mm holes and press in wall
plugs flush with the ceiling.
5. Attach the upper part of the support frame
to the ceiling with 4 screws.
6. Ensure that the support frame is in the
correct position. The middle bracket
defines the preferred side. It must be facing
the hob control.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis