Herunterladen Diese Seite drucken

Weka Garten[Q] Kompakt Montage-, Bedienungs- Und Wartungsanleitung Seite 4

Werbung

- en -
Dear customer
Read these instructions through completely before assembling your product in order to avoid errors
in assembly or damage.
IMPORTANT
Please use the enclosed packing list to check immediately that your Engine house
has been delivered complete and intact.
Please do not dispose of the packing list before the guarantee period has expired. This list enables you to
check that all the individual parts are present. It should be retained along with the proof of purchase. Any
complaints which may arise can probably be easily rectified with this list.
We recommend that 2 people carry out the assembly.
In order to prevent accidents, we recommend that children are kept out of the direct vicinity during
assembly.
We reserve the right to make further technological developments. This means that there many be
minor deviations in the illustrations.
Please do not simply throw away the packaging material. Paper, card and corrugated board as well as
plastic packaging materials should be placed in the correct collection containers.
Recommendations
A prerequisite for successful assembly is an absolutely level and square foundation. We recommend a
continuous foundation.
A foundation plan can be obtained from your specialist dealer.
A raft foundation is also possible.
In order to avoid rising damp, we recommend that a barrier layer using the packaging film, roofing paper or
similar be laid between the foundation and the floor beams.
Roofing paper for a barrier layer is not included in the scope of this delivery.
Fit the wall boards together, with the tongue pointing upwards. If necessary, use a rubber mallet,
where the assembly timber will prevent any damage to the tongue. The assembly timber can be
found in the front wall package.
The structure should be anchored to the foundation to protect against wind damage. Concrete anchors or
steel angles obtainable from specialist suppliers are suitable for anchoring the floor beams to the foundation.
The anchors are not included in the scope of this delivery.
Please drill pilot holes for all screw connections to avoid damaging the wood. The following symbol in the
instructions will indicate when this is necessary:
Wood protection
Before and during assembly, protect untreated wood from direct sunlight or moisture.
The product is made from natural timber, for which regular and adequate wood preservation measures are
obligatory. Please contact a wood preservation expert for information on professional preservation
measures.
Wood preservation is to be carried out by the customer at his own risk. No guarantee can be given in the
event of wood preservation not carried out in accordance with the instructions. Please also note the
provisions relating to this in our guarantee. We wish you much pleasure with your wood product.
Doors and windows are to be treated both inside and outside with the wood protection agent.
The floor beams have already been adequately treated by us (boiler pressure impregnated).
A regular coating in accordance with the manufacturer's instructions of the wood protection agent is
necessary to protect the wood.
 Copyright weka-Holzbau GmbH, Neubrandenburg
3
Techn. Änderungen vorbehalten!

Werbung

loading