Installing the
Li er-Robot 3
Drawer Full
Indicator
Kit includes: Drawer Full Indicator board assembly,
(2) retainers, and (4) screws.
You will need:
Needle-nose pliers
Preparation:
1
Press the Power bu on to turn the unit o and
unplug it from the wall. Remove the Bonnet,
Globe, and Waste Drawer.
For detailed instructions, visit
h ps:/ /www.li er-robot.com/owners-manual.html
4
Separate the Bezel from the Control Panel by
pushing the bu ons through and li ing up. Set
the Bezel and screws aside.
Note: The Circuit Board and Keypad may be held in
place by a piece of tape (assembly aid). If present,
simply remove it; it is not required for reassembly.
LR3-8051-0d
The previous model of the DFI Kit, made until October 2022, is pictured on top.
The updated DFI Kit is pictured on the bo om.
2
The plastic component that covers the Control
Panel on the Base is called the Bezel. Unscrew
the 5 screws to remove the Bezel.
5
Turn the Keypad/Circuit Board over and unplug
the 4-pin connector (that holds the red, yellow,
black, and blue Drawer Full Indicator wires).
Installation guide
8-inch #2 Phillips screwdriver (20.3 cm)
3
Use needle-nose pliers to li the Bezel out of
place.
6
Free the Drawer Full Indicator wires by peeling back
the piece of tape that holds the wires in the channel
and out of the way of the Motor.
Note: It is best to reuse the tape. If the tape cannot be
reused, replace it with a piece of stretchable tape that
adheres strongly to the Base to ensure it will remain in
place over time. We recommend Scotch 8884 Stretchable
tape or something comparable.
Questions? Visit
whiskersuppo .com
How to install