SONOFF
TECHNOLOGIES
Operating
1. Power
off
ATO avoid electric shocks, please consult the dealer or a qualified professional for
help when
installing
2. Wiring
instruction
Wiring:
16-18AWG
100-240VAC
O Make sure the neutral wire and live wire connection iscorrect.
TOensure the safety Of your electrical installation,
Circuit Breaker (MCB) or a Residual Current Operated Circuit Breaker (RCBO) with
an electrical rating of IOA has been installed before the BASICR2, RFR2.
3. Download
the
CO., LTD.
Instruction
and repairing!
SOL/STR copper
o
o
eWeLink
APP
I eWeLink
IT ON
Google Play
Please do not touch the switch
conductor
only, Tightening
O
o
it's essential either a Miniature
Download
App Store
6
English
during
torque:
3.5 lb-in.
N out
L out
on the
use.