Herunterladen Diese Seite drucken

Bernstein DUSCH-WC 540 Montage- Und Bedienungsanleitung Seite 26

Vorschau ausblenden Andere Handbücher für DUSCH-WC 540:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Shut-off valve
Outlet water hose
Mounting block
7. Put the toilet seats set on the top of ceramic body
and then open the upper cover, fastened by fixing
screw and then put the decoration panel.
9. Insert the power plug into the waterproof
socket with corresponding voltage.
After confirming that the power plug is inserted,
press the reset key, and the indicator light will
light up, indicating normal power on;
After power on, you can hear the system
buzzer „tick".
10
SHOWER TOILET 540 / 540
Pro -
6. Attach outlet water hose to the toilet.
SHOWER TOILET 540 / 540
SHOWER TOILET 560 / 560
8. When finish the installation, remove the
packaging toward the arrow direction.
The remote control panel is installed in
the distance from the ground around
1600mm for convenience.
It works when light on
after pressing power
plug the reset button.
There will be sounded
after connected to
power.
560 / 560
Pro
Decorative cap
Screw rod
Fixing hole
Decorative cap
Screw rod
Fixing hole
Test button
Reset button
Pro
Pro

Werbung

loading