Herunterladen Inhalt Inhalt Diese Seite drucken

Step 2: Connect To Grid Power - Ecoflow Stream Ac Pro Installationsanleitung

Vorschau ausblenden Andere Handbücher für STREAM AC Pro:
Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

Step 2: Connect to Grid Power

• The grid connection must be connected to a grounded electrical outlet or grounding busbar. Additionally,
grounding the product casing via its dedicated grounding terminal is recommended for enhanced safety.
• Ensure the device is powered off before installation.
• Method 1: Connect via a Home Outlet
A2
×1
• Method 2: Connect via a Home Circuit Breaker (United Kingdom Only)
• Professional Installation Required: This step must be carried out by a qualified electrician.
• Power Must Be Off: Before beginning installation, ensure the power is switched off at the installation site.
• The PE and N wires should be connected separately to the PE-bar and Neutral-bar, and the L wire should be
connected to the terminal on the breaker that leads to the load side.
A2
×1
6 |
Click
A2
Click
PH0
PH0
A2
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Stream ac

Inhaltsverzeichnis