Inspection
before commissioning/lnspektion
Contröle
avant
Controllo
prima della messa in servizio/Przeglqd
Inspeqäo antes da ativaqäo/lnspectie
Inspektion
före idriftsättning/Tarkastus
Item
Description
The charger is correct y mounted at a place that is convenient
Location
for operation and maintenance
Charger
The charger is firm y and securely installed
Cable
Cables are correctly and firmly connected, and are adequately
protected from damage
Current leakage
The AC input's current eakage protection switch is reasonable
protection
The charger has sufficient cooling space and there is no other
Clearance
stuff or components are left on the top of the charger.
Commissioning/Inbetriebnahme/Mise
Messa in servizio/Uruchomienie/AtivaGäo/Ingebruikneming/Idriftsättning/
Käyttöönotto
Step 1 Ensure that all requirements are met before commissioning
Step 2 Turn on the current leakage protection switch Of the AC input
Step 3 Power on the charger.
The blue LED blinks slowly which indicates the charger is in standby mode
Step 4 Download the iEnergyCharge app, and fol ow the on-screen instructions to start a charging session
O
Email
Password
mise au point/lnspecciön
iEnergyCharge App
vor der Inbetriebnahme/
antes
de la puesta
przed uruchomieniem/
voor ingebruikname/
ennen käyttöönottoa
au point/Puesta
code
en marcha/
Judgment
Yes
en marcha/
No