INSTALLATION
In order to ensure correct operation, the following rules must be respected:
· Installation must be performed by qualified personnel.
· Position the receiver vertically (with the cable outlet facing downwards)
and in an accessible way.
In order not to compromise reception, the SMARTBOX must not be shielded
from ferrous masses (e.g. protective casing).
CNTR 8
DRILLING TEMPLATE
CNTR 20
DRILLING TEMPLATE
89