5.2 Commissioning

Commissioning includes testing of the detecting range
and adjusting of the operating parameters with the
potentiometers.
Testing the detecting range
Testing the detecting range for size, sources of inter-
ference and coverage in the room.
Withdraw the mask.
Withdraw the trim ring (4) Fig. 1).
Turn the time potentiometer (9) to test (Fig. 4).
Turn the lux potentiometer (10) to
Turn the sens potentiometer (6) to max (Fig. 4).
Switch on the mains voltage.
The detector performs a brief initialization. During
the initialization, the indiator LED is lit up (Fig. 1)
(8). Thereafter, the test mode is active and the light
is switched on for abt. 1 s.
As long as movements are detected, the light is
switched on again after a locking delay of abt. 3 s.
NL

5.2 Inbedrijfstelling

Inbedrijfstelling behelst het testen van het detectie-
gebied en het instellen van de bedrijfsparameters op
de potentiometers.
Detectiegebied controleren
Controle van het detectiegebied op grootte, storings-
bronnen en ligging in de ruimte.
Kapje lostrekken.
Sierring (4) lostrekken (afbeelding 1).
Potentiometer time (9) op test instellen (afbeelding 4).
Potentiometer lux (10) op
(Fig. 4).
Potentiometer sens (6) op max instellen
(afbeelding 4).
Netspanning inschakelen.
De detector wordt kort gekalibreerd. Tijdens het
kalibreren brandt de indicatie-LED (afbeelding 1)
(8). Daarna is de testmodus actief en wordt de
verlichting ca. 1 s ingeschakeld.
Worden er nog steeds bewegingen herkend, volgt
een nieuwe inschakeling na afloop van een ver-
grendelingstijd van ca. 3 s.