Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 7

2 Operation

2.1 Visual inspection
Caution!
Incorrect finishing of the installation can lead to property
damage.
Note
If an installation error is found during visual inspection,
temporarily stop and correct the error.
Finish the installation by following these steps:
1.
Check the complete installation:
1.1.
Make sure that the hydraulics are connected correctly.
1.2.
Check that any dirt accumulated during installation and/
or dust on the unit has been removed properly. Check
strainers and, if necessary, flush/ clean them.
1.3.
Check the tightness of all gaskets on pipe - and device
connections and tighten them if necessary. When
tightening connections, always lock the opposite side.
1.4.
Optional: Check that all electrical connections have been
made correctly, including polarity of the mains connection
and that earthing is assured.
2.
Check that the installation is filled/ flushed and vented.
2.2 Changing the pump settings
Note
It is recommended that the pump runs at constant
pressure when used for underfloor heating. The factory
setting of the pump is not set to constant pressure and
must therefore be changed
The pump (Grundfos UPM3) has to be set to the constant pressure
modus (Δp-c) to enable an optimal operation of the underfloor
heating system.
The settings are done on the pump house as described in the
installation and operation manual.
2.3 Configuration via Combi Port
E-Pro app
Combi Port E-Pro
1.
Download the Uponor Combi Port E-Pro app. It is available both
for iOS and Android mobile devices.
2.
Scan the QR code available on the Uponor Combi Port E-Pro
controller.
3.
Press the blue button in the middle of the Uponor Combi Port E-
Pro controller until it flashes. Continue in the App.
PDF
iOS 10.3 and
above
SI0000301
4.
Helptexts and guidance is available in the app.
5.
The app consists of three different user levels (user, installer,
etc). Access is given by activating the received code.
5.1.
Fill in the code in menu "Settings".
5.2.
Reconnect the controller to get the new level (push A,
see "App structure - Overview").
App overview
Item
Description
A
Connection status
B
Settings
C
Hot water
D
Circulation
E
Supplier
F
Heating
G
System
A Connection status
Description
Indication of successful connection
Connection can be manually activated or deactivated
B Settings
Possible settings
Time/date
Language
Controller settings
Load/save configuration
Startup protocol
C Hot water
Possible settings
Hot water temperature
Valve position
Load detection
Adaption period
ECO keep warm
RTL
D Circulation
Possible settings
Calculated circulation setpoint
Return setpoint
Follow-up time
Permanent circulation
Time program circulation
Combi Port E-Pro
Displayed value
Hot water temperature
Hot water flow
Cold water temperature
Performance
Displayed value
Pump status
|
Quick guide
|
5
EN

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis