Herunterladen Diese Seite drucken

STIEBEL ELTRON HSBC 200 L Bedienung Und Installation Seite 35

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
INSTALLATIoN
electrical connection
Note
You must have permission to connect the appliance from
the relevant power supply utility.
The terminal box of the appliance is located behind the front casing
(see chapter "Preparations / Transport and handling / Removing /
fitting the front casing").
f Route all power cables and sensor leads into the appliance
through the cable entry.
f Connect the power cables and sensor leads as detailed
below.
Install cables with the following cross-sections in accordance with
the respective fuse rating:
MCB/fuse
Assignment
rating
B 16 A
Control unit
11.1 Control voltage
Material losses
!
f Only connect energy efficient circulation pumps ap-
proved by us to the pump connections.
XD11
Terminal, control unit
XE03
Earth terminal, control unit
www.stiebel-eltron.com
Cable cross-section
1.5 mm²
Xd11
Terminal, control unit
HKP
Heating circuit pump
MKP
Mixer circuit pump (optional)
Mischer
Mixer servomotor (optional)
11.1.1 HSBC-HKM (optional)
N
L
bn
bk bu
M
M
1~
1~
MA11
MA19
BT13
11.1.2 STB-FB high limit safety cut-out for underfloor heating
systems (optional)
HKP
There are two ways to connect the STB-FB high limit safety cut-
out.
option
A
Remove the jumper.
Connect the high limit safety cut-out
to the terminals.
B
Remove the jumper.
Connect the high limit safety cut-out
to the terminals.
XD11
L
5
6
N
7
8
9
LA
10
LZ
11
N
12
13
XD04
9
-
8
+
7
MKP
Terminal
XD11 (L(1)), XD11 (2(2))
XD11 (L(5)), XD11 (2(6))
HSBC 200 L |
35

Werbung

loading