Herunterladen Diese Seite drucken

STIEBEL ELTRON HSBC 200 L Bedienung Und Installation Seite 29

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
INSTALLATIoN
Preparation
9.2.2 Separating / joining the appliance sections
Separating the appliance sections
f Pull out the "heating sensor" at the buffer cylinder.
f Release the sensor leads from the guide groove in the insula-
tion segment.
f Disconnect the push-fit connectors of the 4 hydraulic con-
nections. To do this, pull the spring clips fully out with a
screwdriver.
f Pull the hydraulic connectors off forwards.
www.stiebel-eltron.com
f Remove the 4 hydraulic hoses and the insulation segment.
f Release the 4 screws on the tabs at the front of the appliance.
f Pull the upper section of the appliance towards the front.
HSBC 200 L |
29

Werbung

loading