Herunterladen Diese Seite drucken

GreenWorks CSE405 Bedienungshandbuch Seite 6

Vorschau ausblenden Andere Handbücher für CSE405:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 10
EN
1. Cut the first time 1/3 of the diameter from the bottom.
2. Cut the second time from the top to complete the
bucking.
When the log is held on two ends,
1. Cut the first time 1/3 of the diameter from the top.
2. Cut the second time lower 2/3 from the bottom to
complete the bucking.
When the log is on a slope,
1. Stand on the uphill side.
2. Control the chainsaw.
3. Hold the handles tightly.
4. Release the cut pressure near the end of the cut.
Do not let the chain touch the ground.
When bucking is complete,
1. Release the trigger.
2. Stop the chainsaw fully.
3. Move the chainsaw from tree to tree.
5
MAINTENANCE
Do not let brake fluids, gasoline, petroleum-based materials
touch the plastic parts. Chemicals can cause damage to the
plastic, and make the plastic unserviceable.
Do not use strong solvents or detergents on the plastic
housing or components.
Remove the battery pack from the machine before
maintenance.
5.1
ADJUST THE CHAIN TENSION
Figure 2-7.
The more you use a chain the longer it becomes. It is
therefore important to adjust the chain regularly to take up the
slack.
Tension the chain as tightly as possible, but not so tight that
you cannot pull it round freely by hand.
A slack chain may jump off and cause serious or even fatal
injury.
Wear protective gloves if you touch the chain, bar or areas
around the chain.
NOTE
CAUTION
CAUTION
WARNING
WARNING
CAUTION
English
1. Stop the machine.
2. Loosen the lock nuts with the wrench.
It is not necessary to remove the chain cover to adjust the
chain tension.
3. Turn the chain adjustment screw clockwise to increase
the chain tension.
4. Turn the chain adjustment screw counterclockwise to
decrease the chain tension.
5. When the chain is at the wanted tension, tighten the lock
nuts.
6. Pull the chain in the middle of the guide bar at the bottom
away from the bar. The gap between the chain guide and
the guide bar should be between 3 mm and 4 mm.
5.2
SHARPEN THE CUTTERS
Sharpen the cutters if it is not easy for the chain to go into the
wood.
We recommend that a service center, which has an electric
sharpener, perform important sharpening work.
Figure 16-19.
1. Tensioning chain.
2. Sharpen the cutters corner with a 5/32 in. (4 mm)
diameter round file .
3. Sharpen the top plate, side plate and depth gauge with a
flat file.
4. File all the cutters to the specified angles and the same
length.
During the process,
Keep the file flat with the surface to be sharpened.
Use the midpoint of the file bar.
Use light but firm pressure when sharpening the
surface.
Lift the file away on each return stroke.
Sharpen the cutters on one side and then move to the
other side.
Replace the chain if:
The length of the cutting edges is less than 5 mm.
There is too much space between the drive links and the
rivets.
The cut speed is slow
Sharpening the chain many times but it does not increase
the cutting speed. The chain is worn.
8
NOTE
NOTE
NOTE

Werbung

loading

Diese Anleitung auch für:

Gd24x2cs36