Herunterladen Diese Seite drucken

IKAR ASS-4 Bedienungsanleitung Seite 17

Vorschau ausblenden Andere Handbücher für ASS-4:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 12
Personal protection - preparing for operational readiness
Please note: operational readiness requires that the IKAR sleeve has already been installed prop-
Insert the cantilever arm into the IKAR sleeve.
Release the socket pin (
Then fold the cantilever arm upwards (
The ASS-4 cantilever arm is now ready for basic use.
It is disassembled in the reverse sequence.
2
1
B
Please note:
erly. Note whether it is horizontal or vertical.
) by pressing with the thumb and pull out.
A
) and secure with the socket pin (
B
A
C
17
).
C
Similar to illustration
GB

Werbung

loading

Verwandte Produkte für IKAR ASS-4

Diese Anleitung auch für:

Ass-1